Article

Determining the Optimum Cut-Off Grades in Sulfide Copper Deposits

Alternative title Określanie Optymalnej Wartości Odcięcia Zawartości Procentowej Pierwiastka Użytecznego W Złożach Siarczku Miedzi

Details

Citation

Rahimi E, Oraee K, Shafahi ZA & Ghasemzadeh H (2015) Determining the Optimum Cut-Off Grades in Sulfide Copper Deposits [Określanie Optymalnej Wartości Odcięcia Zawartości Procentowej Pierwiastka Użytecznego W Złożach Siarczku Miedzi]. Archives of Mining Sciences, 60 (1), pp. 313-328. https://doi.org/10.1515/amsc-2015-0021

Abstract
Optimum cut-off grades determination in mining life affects production planning and ultimate pit limit and it is also important from social, economical and environmental aspects. Calculation of optimum cut-off grades has been less considered for mines containing various mineral processing methods. In this paper, an optimization technique is applied to obtain optimum cut-off grades for both concentration and heap leaching processes. In this technique, production costs and different recoveries of heap leaching method directed into modeling different annual cash flows in copper mines. Considering the governing constraints, the Lagrange multiplier method is practiced to optimize the cut-off grades in which the objective function is supposed to maximize Net Present Value. The results indicate the effect of heap leaching process on the optimum cut-off grades of primary and secondary sulfide deposits.

Keywords
optimum cut-off grades; heap leaching; concentration; sulfide deposits

Journal
Archives of Mining Sciences: Volume 60, Issue 1

StatusPublished
Publication date31/05/2015
Publication date online01/05/2015
Date accepted by journal01/05/2015
URLhttp://hdl.handle.net/1893/21640
PublisherDe Gruyter Open
eISSN1689-0469

Files (1)